IAC logo
IAC Assessment: CO0514
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0514
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product Machined silicon parts
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 19,600
Annual Production 282,000 Pieces
Production Hrs. Annual 5,200
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,352 546,320 kWh $0.04
Electricity Demand $22,721 2,829 kW-months/year $8.03
Electricity Fees $96 - $ -
Natural Gas $3,102 498 MMBtu $6.23
TOTAL ENERGY COSTS $51,104
RECOMMENDED SAVINGS* $20,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $273
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$273
Cost:
$456
$196 4,849 $77 10 - - - - - - - - $196
4,849
kWh
$77
10
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,160
Cost:
$2,000
- - $1,160 144 - - - - - - - - -
-
kWh
$1,160
144
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$510
Cost:
$770
$410 10,200 $100 13 - - - - - - - - $410
10,200
kWh
$100
13
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$200
Cost:
-
$200 5,000 - - - - - - - - - - $200
5,000
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
05: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$18,470
Cost:
$30,800
- - - - $7,090 23,055,000 $(-5,850) - $14,270 - $2,960 - -
-
kWh
-
-
kW-months/year
$7,090
23,055,000
Tgal
$(-5,850)
-
$
$14,270
-
$
$2,960
-
Tgal
TOTAL RECOMMENDED Savings:
$20,613
Cost:
$34,026
$806 20,049 $1,337 167 $7,090 23,055,000 $(-5,850) - $14,270 - $2,960 - $806
20,049
kWh
$1,337
167
kW-months/year
$7,090
23,055,000
Tgal
$(-5,850)
-
$
$14,270
-
$
$2,960
-
Tgal
TOTAL IMPLEMENTED Savings:
$273
Cost:
$456
$196 4,849 $77 10 - - - - - - - - $196
4,849
kWh
$77
10
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Water Consumption