IAC Assessment: CO0522
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0522
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2003
Principal Product Metal missile cases
NAICS 332994 - Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3489 - Ordnance And Accessories, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 56,730
Annual Production 17,400 Pieces
Production Hrs. Annual 2,080
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,829 1,059,600 kWh $0.04
Electricity Demand $44,251 3,643 kW-months/year $12.15
LPG $13,330 1,586 MMBtu $8.40
TOTAL ENERGY COSTS $98,410
RECOMMENDED SAVINGS* $20,084 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,140
Cost:
$10,660
$3,660 93,600 $8,840 720 $(-3,360) (-400) - - - - $3,660
93,600
kWh
$8,840
720
kW-months/year
$(-3,360)
(-400)
MMBtu
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,420
Cost:
$10,000
- - $4,420 360 - - - - - - -
-
kWh
$4,420
360
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,300
Cost:
$840
- - - - - - $4,300 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,300
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,870
Cost:
$1,950
$1,960 50,000 $(-700) (-57) $610 73 - - - - $1,960
50,000
kWh
$(-700)
(-57)
kW-months/year
$610
73
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$170
Cost:
$414
$76 1,950 $112 9 - - - - $(-18) - $76
1,950
kWh
$112
9
kW-months/year
-
-
MMBtu
-
-
$
$(-18)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$184
Cost:
$308
$68 1,716 $96 8 - - - - $20 - $68
1,716
kWh
$96
8
kW-months/year
-
-
MMBtu
-
-
$
$20
-
$
TOTAL RECOMMENDED Savings:
$20,084
Cost:
$24,172
$5,764 147,266 $12,768 1,040 $(-2,750) (-327) $4,300 - $2 - $5,764
147,266
kWh
$12,768
1,040
kW-months/year
$(-2,750)
(-327)
MMBtu
$4,300
-
$
$2
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand LPG Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Administrative Changes Ancillary Material Cost