IAC logo
IAC Assessment: CO0535
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0535
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2003
Principal Product Acoustic guitars
NAICS 339992 - Musical Instrument Manufacturing
SIC 3931 - Musical Instruments
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 20,750
Annual Production 12,000 Pieces
Production Hrs. Annual 4,680
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,074 1,873,280 kWh $0.04
Electricity Demand $28,946 3,604 kW-months/year $8.03
Electricity Fees $96 - $ -
Natural Gas $51,323 10,018 MMBtu $5.12
TOTAL ENERGY COSTS $156,439
RECOMMENDED SAVINGS* $88,931 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,981
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$30,840
Cost:
$6,420
$3,990 83,500 - - $26,850 3,587 - - - - $3,990
83,500
kWh
-
-
kW-months/year
$26,850
3,587
MMBtu
-
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,820
Cost:
$6,420
$9,820 205,800 - - - - - - - - $9,820
205,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,160
Cost:
$15,760
$7,160 150,100 - - - - - - - - $7,160
150,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,340
Cost:
$750
$4,340 90,800 $1,000 125 - - - - - - $4,340
90,800
kWh
$1,000
125
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,250
Cost:
$9,690
$2,550 53,500 $1,100 137 - - - - $(-400) - $2,550
53,500
kWh
$1,100
137
kW-months/year
-
-
MMBtu
-
-
$
$(-400)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,100
Cost:
$2,820
$590 12,400 $510 63 - - - - - - $590
12,400
kWh
$510
63
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$670
Cost:
$1,210
- - $670 84 - - - - - - -
-
kWh
$670
84
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$411
Cost:
$112
$318 6,669 $135 17 - - - - $(-42) - $318
6,669
kWh
$135
17
kW-months/year
-
-
MMBtu
-
-
$
$(-42)
-
$
09: 4.426 MODIFY WORKLOAD Savings:
$30,340
Cost:
$6,600
- - - - - - $43,840 - $(-13,500) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$43,840
-
$
$(-13,500)
-
$
TOTAL RECOMMENDED Savings:
$88,931
Cost:
$49,782
$28,768 602,769 $3,415 426 $26,850 3,587 $43,840 - $(-13,942) - $28,768
602,769
kWh
$3,415
426
kW-months/year
$26,850
3,587
MMBtu
$43,840
-
$
$(-13,942)
-
$
TOTAL IMPLEMENTED Savings:
$25,981
Cost:
$32,732
$24,188 506,869 $2,235 279 - - - - $(-442) - $24,188
506,869
kWh
$2,235
279
kW-months/year
-
-
MMBtu
-
-
$
$(-442)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost