Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2004 |
Principal Product | Pressure sensitive tape |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 133,000,000 Thousand Feet |
Production Hrs. Annual | 8,760 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $460,227 | 14,863,000 | kWh | $0.03 |
Electricity Demand | $419,173 | 37,333 | kW-months/year | $11.23 |
Electricity Fees | $1,479 | - | $ | - |
Natural Gas | $486,631 | 107,967 | MMBtu | $4.51 |
TOTAL ENERGY COSTS | $1,367,510 | |||
RECOMMENDED SAVINGS* | $81,920 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,410 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $29,210 Cost: $116,000 |
$13,410 | 650,800 | $15,800 | 892 | - | - | - | - |
$13,410 650,800 kWh |
$15,800 892 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $12,000 Cost: $27,900 |
- | - | - | - | $12,000 | 2,427 | - | - |
- - kWh |
- - kW-months/year |
$12,000 2,427 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,130 Cost: $3,800 |
- | - | - | - | $6,130 | 1,239 | - | - |
- - kWh |
- - kW-months/year |
$6,130 1,239 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,920 Cost: $510 |
$2,720 | 132,000 | $3,200 | 181 | - | - | - | - |
$2,720 132,000 kWh |
$3,200 181 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,780 Cost: $60 |
$2,180 | 106,040 | $3,600 | 203 | - | - | - | - |
$2,180 106,040 kWh |
$3,600 203 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $650 Cost: $500 |
$650 | 31,700 | - | - | - | - | - | - |
$650 31,700 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $390 Cost: $360 |
$180 | 8,800 | $210 | 12 | - | - | - | - |
$180 8,800 kWh |
$210 12 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $21,840 Cost: $58,140 |
$12,370 | 600,400 | $14,580 | 823 | - | - | $(-5,110) | - |
$12,370 600,400 kWh |
$14,580 823 kW-months/year |
- - MMBtu |
$(-5,110) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $81,920 Cost: $207,270 |
$31,510 | 1,529,740 | $37,390 | 2,111 | $18,130 | 3,666 | $(-5,110) | - | $31,510 1,529,740 kWh |
$37,390 2,111 kW-months/year |
$18,130 3,666 MMBtu |
$(-5,110) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,410 Cost: $59,150 |
$15,740 | 764,100 | $17,780 | 1,004 | - | - | $(-5,110) | - | $15,740 764,100 kWh |
$17,780 1,004 kW-months/year |
- - MMBtu |
$(-5,110) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||