IAC Assessment: CO0552
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0552
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2004
Principal Product Wireless communication components
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 250,000
Annual Production 225,000 Pieces
Production Hrs. Annual 8,760
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $747,506 19,324,800 kWh $0.04
Electricity Demand $281,154 30,888 kW-months/year $9.10
Electricity Fees $69,787 - $ -
Natural Gas $159,712 27,345 MMBtu $5.84
TOTAL ENERGY COSTS $1,258,159
RECOMMENDED SAVINGS* $82,754 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,904
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$47,960
Cost:
$7,780
$34,220 902,200 $13,740 1,236 - - - - - - $34,220
902,200
kWh
$13,740
1,236
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,570
Cost:
$620
$5,400 142,400 $2,170 195 - - - - - - $5,400
142,400
kWh
$2,170
195
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,520
Cost:
$270
$3,940 103,900 $1,580 142 - - - - - - $3,940
103,900
kWh
$1,580
142
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$834
Cost:
$560
$595 15,709 $239 22 - - - - - - $595
15,709
kWh
$239
22
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,500
Cost:
$3,050
$1,070 28,100 $430 39 - - - - - - $1,070
28,100
kWh
$430
39
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$14,250
Cost:
$71,200
$10,500 286,900 $3,750 337 - - - - - - $10,500
286,900
kWh
$3,750
337
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,170
Cost:
$20,000
- - $(-820) (-74) $1,990 2,190,000 $(-480) - $3,480 - -
-
kWh
$(-820)
(-74)
kW-months/year
$1,990
2,190,000
Tgal
$(-480)
-
$
$3,480
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$950
Cost:
$2,800
$860 22,800 $90 8 - - - - - - $860
22,800
kWh
$90
8
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$82,754
Cost:
$106,280
$56,585 1,502,009 $21,179 1,905 $1,990 2,190,000 $(-480) - $3,480 - $56,585
1,502,009
kWh
$21,179
1,905
kW-months/year
$1,990
2,190,000
Tgal
$(-480)
-
$
$3,480
-
Tgal
TOTAL IMPLEMENTED Savings:
$9,904
Cost:
$4,230
$7,065 186,209 $2,839 256 - - - - - - $7,065
186,209
kWh
$2,839
256
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption