Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2004 |
Principal Product | Wireless communication components |
NAICS | 334419 - Other Electronic Component Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 225,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | NM |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $747,506 | 19,324,800 | kWh | $0.04 |
Electricity Demand | $281,154 | 30,888 | kW-months/year | $9.10 |
Electricity Fees | $69,787 | - | $ | - |
Natural Gas | $159,712 | 27,345 | MMBtu | $5.84 |
TOTAL ENERGY COSTS | $1,258,159 | |||
RECOMMENDED SAVINGS* | $82,754 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,904 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $47,960 Cost: $7,780 |
$34,220 | 902,200 | $13,740 | 1,236 | - | - | - | - | - | - |
$34,220 902,200 kWh |
$13,740 1,236 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,570 Cost: $620 |
$5,400 | 142,400 | $2,170 | 195 | - | - | - | - | - | - |
$5,400 142,400 kWh |
$2,170 195 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,520 Cost: $270 |
$3,940 | 103,900 | $1,580 | 142 | - | - | - | - | - | - |
$3,940 103,900 kWh |
$1,580 142 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $834 Cost: $560 |
$595 | 15,709 | $239 | 22 | - | - | - | - | - | - |
$595 15,709 kWh |
$239 22 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,500 Cost: $3,050 |
$1,070 | 28,100 | $430 | 39 | - | - | - | - | - | - |
$1,070 28,100 kWh |
$430 39 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $14,250 Cost: $71,200 |
$10,500 | 286,900 | $3,750 | 337 | - | - | - | - | - | - |
$10,500 286,900 kWh |
$3,750 337 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $4,170 Cost: $20,000 |
- | - | $(-820) | (-74) | $1,990 | 2,190,000 | $(-480) | - | $3,480 | - |
- - kWh |
$(-820) (-74) kW-months/year |
$1,990 2,190,000 Tgal |
$(-480) - $ |
$3,480 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $950 Cost: $2,800 |
$860 | 22,800 | $90 | 8 | - | - | - | - | - | - |
$860 22,800 kWh |
$90 8 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,754 Cost: $106,280 |
$56,585 | 1,502,009 | $21,179 | 1,905 | $1,990 | 2,190,000 | $(-480) | - | $3,480 | - | $56,585 1,502,009 kWh |
$21,179 1,905 kW-months/year |
$1,990 2,190,000 Tgal |
$(-480) - $ |
$3,480 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,904 Cost: $4,230 |
$7,065 | 186,209 | $2,839 | 256 | - | - | - | - | - | - | $7,065 186,209 kWh |
$2,839 256 kW-months/year |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Water Consumption |