Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2004 |
Principal Product | Miscellaneous Steel Fabrication |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 145 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 6,968 |
Location (State) | ND |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,299 | 2,382,480 | kWh | $0.04 |
Electricity Demand | $52,532 | 6,566 | kW-months/year | $8.00 |
Electricity Fees | $8,460 | - | $ | - |
Natural Gas | $163,846 | 24,701 | MMBtu | $6.63 |
TOTAL ENERGY COSTS | $326,137 | |||
RECOMMENDED SAVINGS* | $22,646 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,876 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7244 REVISE SMOKE CLEANUP FROM OPERATIONS |
Savings: $4,790 Cost: $13,100 |
$(-2,310) | (-57,800) | $(-790) | (-99) | $7,890 | 1,267 | - | - | - | - |
$(-2,310) (-57,800) kWh |
$(-790) (-99) kW-months/year |
$7,890 1,267 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $900 Cost: $580 |
- | - | - | - | $900 | 144 | - | - | - | - |
- - kWh |
- - kW-months/year |
$900 144 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $186 Cost: $260 |
$138 | 3,434 | $48 | 6 | - | - | - | - | - | - |
$138 3,434 kWh |
$48 6 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $220 Cost: $420 |
$220 | 5,600 | - | - | - | - | - | - | - | - |
$220 5,600 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,890 Cost: $37,430 |
$12,250 | 306,200 | $4,240 | 530 | - | - | - | - | $(-2,600) | - |
$12,250 306,200 kWh |
$4,240 530 kW-months/year |
- - MMBtu |
- - $ |
$(-2,600) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,540 Cost: $4,990 |
$1,090 | 27,200 | $1,030 | 129 | - | - | $(-10) | - | $430 | - |
$1,090 27,200 kWh |
$1,030 129 kW-months/year |
- - MMBtu |
$(-10) - $ |
$430 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $120 Cost: $390 |
$120 | 3,000 | - | - | - | - | - | - | - | - |
$120 3,000 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,646 Cost: $57,170 |
$11,508 | 287,634 | $4,528 | 566 | $8,790 | 1,411 | $(-10) | - | $(-2,170) | - | $11,508 287,634 kWh |
$4,528 566 kW-months/year |
$8,790 1,411 MMBtu |
$(-10) - $ |
$(-2,170) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,876 Cost: $13,940 |
$(-2,172) | (-54,366) | $(-742) | (-93) | $8,790 | 1,411 | - | - | - | - | $(-2,172) (-54,366) kWh |
$(-742) (-93) kW-months/year |
$8,790 1,411 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |