IAC logo
IAC Assessment: CO0568
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0568
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2005
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 28,000
Annual Production 12,000 Pieces
Production Hrs. Annual 6,864
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,774 2,726,342 kWh $0.03
Electricity Demand $84,060 6,355 kW-months/year $13.23
Electricity Fees $960 - $ -
Natural Gas $43,567 6,054 MMBtu $7.20
TOTAL ENERGY COSTS $209,361
RECOMMENDED SAVINGS* $22,270 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,960
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,510
Cost:
$330
$1,480 44,000 $1,030 77 - - - - - - - - $1,480
44,000
kWh
$1,030
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$540
Cost:
-
$540 16,000 - - - - - - - - - - $540
16,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$350
Cost:
$1,140
$230 6,700 $120 9 - - - - - - - - $230
6,700
kWh
$120
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.8112 COMBINE UTILITY METERS Savings:
$10,660
Cost:
$43,050
- - $10,630 794 - - - - $30 - - - -
-
kWh
$10,630
794
kW-months/year
-
-
MMBtu
-
-
$
$30
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,100
Cost:
$6,680
$2,040 60,700 $1,810 135 - - $120 - - - $130 - $2,040
60,700
kWh
$1,810
135
kW-months/year
-
-
MMBtu
$120
-
$
-
-
$
$130
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,690
Cost:
$6,440
$1,540 45,800 $1,070 80 - - - - - - $80 - $1,540
45,800
kWh
$1,070
80
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$80
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$660
Cost:
$2,400
$120 3,500 $70 5 - - $230 - - - $240 - $120
3,500
kWh
$70
5
kW-months/year
-
-
MMBtu
$230
-
$
-
-
$
$240
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$400
Cost:
$1,750
- - - - $400 54 - - - - - - -
-
kWh
-
-
kW-months/year
$400
54
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$360
Cost:
$1,510
- - - - $360 48 - - - - - - -
-
kWh
-
-
kW-months/year
$360
48
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,270
Cost:
$63,300
$5,950 176,700 $14,730 1,100 $760 102 $350 - $30 - $450 - $5,950
176,700
kWh
$14,730
1,100
kW-months/year
$760
102
MMBtu
$350
-
$
$30
-
$
$450
-
$
TOTAL IMPLEMENTED Savings:
$9,960
Cost:
$15,850
$5,180 154,000 $3,980 297 - - $350 - - - $450 - $5,180
154,000
kWh
$3,980
297
kW-months/year
-
-
MMBtu
$350
-
$
-
-
$
$450
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost