Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2005 |
Principal Product | Wooden trusses |
NAICS | 321214 - Truss Manufacturing |
SIC | 2439 - Structural Wood Members, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 37,500 |
Annual Production | 60,000 Thousand Feet |
Production Hrs. Annual | 5,772 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $47,735 | 1,569,459 | kWh | $0.03 |
Electricity Demand | $72,189 | 5,631 | kW-months/year | $12.82 |
Electricity Fees | $192 | - | $ | - |
Natural Gas | $26,763 | 3,354 | MMBtu | $7.98 |
TOTAL ENERGY COSTS | $146,879 | |||
RECOMMENDED SAVINGS* | $104,710 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,740 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.622 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES |
Savings: $84,000 Cost: $30,670 |
- | - | - | - | - | - | - | - | - | - | $84,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$84,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $4,450 Cost: - |
- | - | $6,530 | 485 | - | - | $(-2,080) | - | - | - | - | - |
- - kWh |
$6,530 485 kW-months/year |
- - MMBtu |
$(-2,080) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,540 Cost: $190 |
$1,330 | 42,700 | $1,210 | 90 | - | - | - | - | - | - | - | - |
$1,330 42,700 kWh |
$1,210 90 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING |
Savings: $200 Cost: $170 |
$110 | 3,600 | $90 | 7 | - | - | - | - | - | - | - | - |
$110 3,600 kWh |
$90 7 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $6,190 Cost: $17,170 |
- | - | - | - | $6,190 | 826 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,190 826 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $4,670 Cost: $9,240 |
$(-230) | (-7,400) | $(-130) | (-10) | $5,030 | 671 | - | - | - | - | - | - |
$(-230) (-7,400) kWh |
$(-130) (-10) kW-months/year |
$5,030 671 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,740 Cost: $980 |
- | - | - | - | $1,740 | 232 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,740 232 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $920 Cost: $1,440 |
$330 | 10,500 | $570 | 42 | - | - | $10 | - | $10 | - | - | - |
$330 10,500 kWh |
$570 42 kW-months/year |
- - MMBtu |
$10 - $ |
$10 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $104,710 Cost: $59,860 |
$1,540 | 49,400 | $8,270 | 614 | $12,960 | 1,729 | $(-2,070) | - | $10 | - | $84,000 | - | $1,540 49,400 kWh |
$8,270 614 kW-months/year |
$12,960 1,729 MMBtu |
$(-2,070) - $ |
$10 - $ |
$84,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,740 Cost: $360 |
$1,440 | 46,300 | $1,300 | 97 | - | - | - | - | - | - | - | - | $1,440 46,300 kWh |
$1,300 97 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product |