IAC logo
IAC Assessment: CO0578
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0578
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2005
Principal Product Clay bricks
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3251 - Brick And Structural Clay Tile
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 91,700
Annual Production 42,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) ND
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,634 3,931,200 kWh $0.03
Electricity Demand $114,170 12,334 kW-months/year $9.26
Electricity Fees $5,425 - $ -
Natural Gas $1,029,476 122,607 MMBtu $8.40
TOTAL ENERGY COSTS $1,279,705
RECOMMENDED SAVINGS* $64,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,880
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$380
Cost:
$3,990
$270 8,300 $110 12 - - - - - - $270
8,300
kWh
$110
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,500
Cost:
$780
$1,080 32,900 $420 45 - - - - - - $1,080
32,900
kWh
$420
45
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$760
Cost:
$1,750
- - - - - - $760 120 - - -
-
kWh
-
-
kW-months/year
-
-
$
$760
120
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$370
Cost:
$1,240
$170 5,200 $200 22 - - - - - - $170
5,200
kWh
$200
22
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$39,590
Cost:
$89,600
$3,180 - $36,950 - $(-540) - - - - - $3,180
-
kWh
$36,950
-
kW-months/year
$(-540)
-
$
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,700
Cost:
$47,250
$14,330 437,200 $5,530 599 - - - - $840 - $14,330
437,200
kWh
$5,530
599
kW-months/year
-
-
$
-
-
MMBtu
$840
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,670
Cost:
$2,880
$1,210 36,800 $460 50 - - - - - - $1,210
36,800
kWh
$460
50
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$64,970
Cost:
$147,490
$20,240 520,400 $43,670 728 $(-540) - $760 120 $840 - $20,240
520,400
kWh
$43,670
728
kW-months/year
$(-540)
-
$
$760
120
MMBtu
$840
-
$
TOTAL IMPLEMENTED Savings:
$1,880
Cost:
$4,770
$1,350 41,200 $530 57 - - - - - - $1,350
41,200
kWh
$530
57
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost