Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2005 |
Principal Product | Bottled and Canned Soft Drinks and Water |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $50,000,000-$100,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 100,400 |
Annual Production | 12,000,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | WY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $94,146 | 2,796,517 | kWh | $0.03 |
Electricity Demand | $79,272 | 8,203 | kW-months/year | $9.66 |
Electricity Fees | $1,777 | - | $ | - |
Natural Gas | $77,617 | 8,820 | MMBtu | $8.80 |
TOTAL ENERGY COSTS | $351,512 | |||
RECOMMENDED SAVINGS* | $24,476 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,796 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $5,020 Cost: $8,800 |
$(-50) | (-1,500) | $(-90) | (-9) | - | - | $1,850 | 1,681,000 | - | - | - | - | $3,310 | - |
$(-50) (-1,500) kWh |
$(-90) (-9) kW-months/year |
- - MMBtu |
$1,850 1,681,000 Tgal |
- - $ |
- - $ |
$3,310 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,640 Cost: $300 |
$1,750 | 53,600 | $890 | 86 | - | - | - | - | - | - | - | - | - | - |
$1,750 53,600 kWh |
$890 86 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $526 Cost: $718 |
$279 | 8,539 | $247 | 24 | - | - | - | - | - | - | - | - | - | - |
$279 8,539 kWh |
$247 24 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,970 Cost: $400 |
$1,090 | 33,200 | $880 | 85 | - | - | - | - | - | - | - | - | - | - |
$1,090 33,200 kWh |
$880 85 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,140 Cost: $3,200 |
$760 | 23,300 | $380 | 37 | - | - | - | - | - | - | - | - | - | - |
$760 23,300 kWh |
$380 37 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $570 Cost: $230 |
$380 | 11,800 | $190 | 19 | - | - | - | - | - | - | - | - | - | - |
$380 11,800 kWh |
$190 19 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $280 Cost: $380 |
$280 | 8,400 | - | - | - | - | - | - | - | - | - | - | - | - |
$280 8,400 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,010 Cost: $11,780 |
$3,610 | 110,300 | $1,830 | 177 | - | - | - | - | $(-40) | - | $610 | - | - | - |
$3,610 110,300 kWh |
$1,830 177 kW-months/year |
- - MMBtu |
- - Tgal |
$(-40) - $ |
$610 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,840 Cost: $11,540 |
$2,990 | 91,300 | $1,510 | 146 | - | - | - | - | $180 | - | $160 | - | - | - |
$2,990 91,300 kWh |
$1,510 146 kW-months/year |
- - MMBtu |
- - Tgal |
$180 - $ |
$160 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $1,380 Cost: $5,220 |
- | - | - | - | $1,380 | 159 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,380 159 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.9111 USE SOLAR HEAT TO HEAT MAKE-UP AIR |
Savings: $100 Cost: $850 |
- | - | - | - | $100 | 12 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$100 12 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,476 Cost: $43,418 |
$11,089 | 338,939 | $5,837 | 565 | $1,480 | 171 | $1,850 | 1,681,000 | $140 | - | $770 | - | $3,310 | - | $11,089 338,939 kWh |
$5,837 565 kW-months/year |
$1,480 171 MMBtu |
$1,850 1,681,000 Tgal |
$140 - $ |
$770 - $ |
$3,310 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,796 Cost: $7,018 |
$3,399 | 103,739 | $2,017 | 195 | $1,380 | 159 | - | - | - | - | - | - | - | - | $3,399 103,739 kWh |
$2,017 195 kW-months/year |
$1,380 159 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption |