IAC Assessment: CO0592
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0592
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2006
Principal Product Chocolate candy
NAICS 311352 - Confectionery Manufacturing from Purchased Chocolate
SIC 2064 - Candy & Other Confectionery Products
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 56,000
Annual Production 300,000 Pounds
Production Hrs. Annual 2,516
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,216 1,793,600 kWh $0.05
Electricity Demand $46,282 3,984 kW-months/year $11.62
Natural Gas $83,864 8,027 MMBtu $10.45
TOTAL ENERGY COSTS $225,362
RECOMMENDED SAVINGS* $11,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,152
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$242
Cost:
$462
$155 2,864 $87 8 - - - - - - $155
2,864
kWh
$87
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$910
Cost:
$270
$540 10,000 $370 31 - - - - - - $540
10,000
kWh
$370
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$180
Cost:
$80
- - - - $180 18 - - - - -
-
kWh
-
-
kW-months/year
$180
18
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,310
Cost:
$21,480
$3,340 61,900 $1,880 159 - - $40 - $50 - $3,340
61,900
kWh
$1,880
159
kW-months/year
-
-
MMBtu
$40
-
$
$50
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,310
Cost:
$6,180
$2,450 45,300 $720 61 - - $80 - $60 - $2,450
45,300
kWh
$720
61
kW-months/year
-
-
MMBtu
$80
-
$
$60
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,650
Cost:
$2,950
$920 17,000 $730 62 - - - - - - $920
17,000
kWh
$730
62
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,602
Cost:
$31,422
$7,405 137,064 $3,787 321 $180 18 $120 - $110 - $7,405
137,064
kWh
$3,787
321
kW-months/year
$180
18
MMBtu
$120
-
$
$110
-
$
TOTAL IMPLEMENTED Savings:
$1,152
Cost:
$732
$695 12,864 $457 39 - - - - - - $695
12,864
kWh
$457
39
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost