IAC Assessment: CO0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2006
Principal Product Concrete pipe
NAICS 327332 - Concrete Pipe Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 11
Plant Area (Sq.Ft.) 16,000
Annual Production 40,000 Tons
Production Hrs. Annual 2,622
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,356 393,200 kWh $0.04
Electricity Demand $20,777 2,994 kW-months/year $6.94
Electricity Fees $813 - $ -
Natural Gas $39,470 4,130 MMBtu $9.56
TOTAL ENERGY COSTS $76,416
RECOMMENDED SAVINGS* $19,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,730
Cost:
$3,350
- - - - $4,730 512 - - - - -
-
kWh
-
-
kW-months/year
$4,730
512
MMBtu
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,550
Cost:
$11,320
- - $4,550 437 - - - - - - -
-
kWh
$4,550
437
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,300
Cost:
$6,900
$1,520 37,200 $1,780 170 - - - - - - $1,520
37,200
kWh
$1,780
170
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$150
Cost:
$442
$60 1,365 $90 9 - - - - - - $60
1,365
kWh
$90
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$380
Cost:
-
- - - - $380 41 - - - - -
-
kWh
-
-
kW-months/year
$380
41
MMBtu
-
-
$
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,200
Cost:
$5,050
- - - - $3,200 347 - - - - -
-
kWh
-
-
kW-months/year
$3,200
347
MMBtu
-
-
$
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,100
Cost:
$2,950
$620 15,200 $480 46 - - - - - - $620
15,200
kWh
$480
46
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$990
Cost:
$3,420
$450 10,900 $520 50 - - - - $20 - $450
10,900
kWh
$520
50
kW-months/year
-
-
MMBtu
-
-
$
$20
-
$
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$950
Cost:
$500
- - - - - - $950 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$950
-
$
-
-
$
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$360
Cost:
$90
- - - - $360 39 - - - - -
-
kWh
-
-
kW-months/year
$360
39
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,710
Cost:
$34,022
$2,650 64,665 $7,420 712 $8,670 939 $950 - $20 - $2,650
64,665
kWh
$7,420
712
kW-months/year
$8,670
939
MMBtu
$950
-
$
$20
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost