IAC logo
IAC Assessment: CO0598
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0598
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2007
Principal Product Aluminum beverage containers
NAICS 332431 - Metal Can Manufacturing
SIC 3411 - Metal Cans
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 330,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,695,916 47,784,906 kWh $0.04
Electricity Demand $894,041 69,935 kW-months/year $12.78
Electricity Fees $1,566 - $ -
Natural Gas $1,322,170 147,235 MMBtu $8.98
TOTAL ENERGY COSTS $3,913,693
RECOMMENDED SAVINGS* $141,720 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$77,320
Cost:
$140,620
$4,720 146,100 $2,720 201 $69,880 8,902 - - $4,720
146,100
kWh
$2,720
201
kW-months/year
$69,880
8,902
MMBtu
-
-
$
02: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$37,380
Cost:
$112,000
- - - - $37,380 4,762 - - -
-
kWh
-
-
kW-months/year
$37,380
4,762
MMBtu
-
-
$
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$15,090
Cost:
$338,400
$46,010 1,423,100 $27,800 2,052 $(-32,320) (-4,117) $(-26,400) - $46,010
1,423,100
kWh
$27,800
2,052
kW-months/year
$(-32,320)
(-4,117)
MMBtu
$(-26,400)
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,960
Cost:
$14,520
$5,690 176,100 $3,270 241 - - - - $5,690
176,100
kWh
$3,270
241
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,660
Cost:
$4,250
- - - - $1,660 211 - - -
-
kWh
-
-
kW-months/year
$1,660
211
MMBtu
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,310
Cost:
$11,000
$470 14,600 $840 62 - - - - $470
14,600
kWh
$840
62
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$141,720
Cost:
$620,790
$56,890 1,759,900 $34,630 2,556 $76,600 9,758 $(-26,400) - $56,890
1,759,900
kWh
$34,630
2,556
kW-months/year
$76,600
9,758
MMBtu
$(-26,400)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes