IAC logo
IAC Assessment: CO0602
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0602
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2007
Principal Product Wood Doors & Architectural Millwork
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 70,000
Annual Production 18,000 Pieces
Production Hrs. Annual 4,680
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,364 1,496,960 kWh $0.03
Electricity Demand $76,273 5,359 kW-months/year $14.23
Electricity Fees $322 - $ -
Natural Gas $8,146 1,000 MMBtu $8.15
Fuel Oil #2 $88,400 4,267 MMBtu $20.72
TOTAL ENERGY COSTS $223,505
RECOMMENDED SAVINGS* $25,267 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,797
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,270
Cost:
$89,570
$4,680 195,100 $7,590 500 - - - - $4,680
195,100
kWh
$7,590
500
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,220
Cost:
$610
$1,720 71,900 $1,500 99 - - - - $1,720
71,900
kWh
$1,500
99
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,460
Cost:
-
$1,460 60,900 - - - - - - $1,460
60,900
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,220
Cost:
$3,430
$660 27,300 $560 37 - - - - $660
27,300
kWh
$560
37
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$117
Cost:
$276
$45 1,863 $72 5 - - - - $45
1,863
kWh
$72
5
kW-months/year
-
-
MMBtu
-
-
$
06: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$5,040
Cost:
-
- - - - $5,040 1,524 - - -
-
kWh
-
-
kW-months/year
$5,040
1,524
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,290
Cost:
$11,000
$350 14,600 $940 62 - - - - $350
14,600
kWh
$940
62
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$600
Cost:
$2,270
$150 6,100 $470 31 - - $(-20) - $150
6,100
kWh
$470
31
kW-months/year
-
-
MMBtu
$(-20)
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$50
Cost:
$200
$30 1,200 $20 1 - - - - $30
1,200
kWh
$20
1
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$25,267
Cost:
$107,356
$9,095 378,963 $11,152 735 $5,040 1,524 $(-20) - $9,095
378,963
kWh
$11,152
735
kW-months/year
$5,040
1,524
MMBtu
$(-20)
-
$
TOTAL IMPLEMENTED Savings:
$4,797
Cost:
$886
$3,225 134,663 $1,572 104 - - - - $3,225
134,663
kWh
$1,572
104
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Ancillary Material Cost