IAC Assessment: CO0604
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2007
Principal Product Gypsum wallboard
NAICS 327420 - Gypsum Product Manufacturing
SIC 3275 - Gypsum Products
Sales $100,000,000-$500,000,000
# of Employees 115
Plant Area (Sq.Ft.) 322,100
Annual Production 1,128,400 Thousand Feet
Production Hrs. Annual 7,176
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $767,965 20,647,200 kWh $0.04
Electricity Demand $319,233 35,208 kW-months/year $9.07
Electricity Fees $66,758 - $ -
Natural Gas $7,017,199 802,160 MMBtu $8.75
TOTAL ENERGY COSTS $8,171,155
RECOMMENDED SAVINGS* $325,520 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$140,220
Cost:
$500,000
- - - - $140,220 16,043 - - - - -
-
kWh
-
-
kW-months/year
$140,220
16,043
MMBtu
-
-
$
-
-
$
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$112,000
Cost:
$18,430
- - - - $112,000 12,815 - - - - -
-
kWh
-
-
kW-months/year
$112,000
12,815
MMBtu
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$27,400
Cost:
$2,500
$18,260 450,600 $9,140 753 - - - - - - $18,260
450,600
kWh
$9,140
753
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,820
Cost:
$310
$9,870 243,500 $4,950 407 - - - - - - $9,870
243,500
kWh
$4,950
407
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,080
Cost:
$68,340
$21,460 529,600 $8,990 740 - - $700 - $(-70) - $21,460
529,600
kWh
$8,990
740
kW-months/year
-
-
MMBtu
$700
-
$
$(-70)
-
$
TOTAL RECOMMENDED Savings:
$325,520
Cost:
$589,580
$49,590 1,223,700 $23,080 1,900 $252,220 28,858 $700 - $(-70) - $49,590
1,223,700
kWh
$23,080
1,900
kW-months/year
$252,220
28,858
MMBtu
$700
-
$
$(-70)
-
$
TOTAL IMPLEMENTED Savings:
$42,220
Cost:
$2,810
$28,130 694,100 $14,090 1,160 - - - - - - $28,130
694,100
kWh
$14,090
1,160
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost