IAC logo
IAC Assessment: CO0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2008
Principal Product Fabricated glass products
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 144
Plant Area (Sq.Ft.) 84,300
Annual Production 5,400,000 Pounds
Production Hrs. Annual 7,975
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $267,487 8,278,441 kWh $0.03
Electricity Demand $380,205 24,519 kW-months/year $15.51
Electricity Fees $357 - $ -
Natural Gas $30,873 3,778 MMBtu $8.17
TOTAL ENERGY COSTS $678,922
RECOMMENDED SAVINGS* $51,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,410
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,560
Cost:
$23,950
$5,560 156,500 - - - - - - - - $5,560
156,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,550
Cost:
$200
$2,630 74,000 $1,920 118 - - - - - - $2,630
74,000
kWh
$1,920
118
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$500
Cost:
$1,755
$300 8,349 $200 13 - - - - - - $300
8,349
kWh
$200
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,810
Cost:
$33,480
- - - - $20,810 2,562 - - - - -
-
kWh
-
-
kW-months/year
$20,810
2,562
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,360
Cost:
$20,290
$11,610 326,800 $6,740 415 - - $450 - $(-440) - $11,610
326,800
kWh
$6,740
415
kW-months/year
-
-
MMBtu
$450
-
$
$(-440)
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,770
Cost:
$11,000
$520 14,600 $1,250 77 - - - - - - $520
14,600
kWh
$1,250
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$51,550
Cost:
$90,675
$20,620 580,249 $10,110 623 $20,810 2,562 $450 - $(-440) - $20,620
580,249
kWh
$10,110
623
kW-months/year
$20,810
2,562
MMBtu
$450
-
$
$(-440)
-
$
TOTAL IMPLEMENTED Savings:
$23,410
Cost:
$22,245
$14,540 409,149 $8,860 546 - - $450 - $(-440) - $14,540
409,149
kWh
$8,860
546
kW-months/year
-
-
MMBtu
$450
-
$
$(-440)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost