IAC Assessment: CO0612
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0612
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2008
Principal Product Kitchen & bathroom cabinets
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 161
Plant Area (Sq.Ft.) 199,000
Annual Production 125,000 Pieces
Production Hrs. Annual 2,860
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,779 2,154,555 kWh $0.03
Electricity Demand $143,624 8,761 kW-months/year $16.39
Electricity Fees $384 - $ -
Natural Gas $85,222 10,160 MMBtu $8.39
TOTAL ENERGY COSTS $300,009
RECOMMENDED SAVINGS* $38,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,080
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$13,590
Cost:
$59,400
$1,150 31,100 $5,990 367 - - - - $6,450 - $1,150
31,100
kWh
$5,990
367
kW-months/year
-
-
MMBtu
-
-
$
$6,450
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,920
Cost:
$300
$1,280 34,600 $640 38 - - - - - - $1,280
34,600
kWh
$640
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$160
Cost:
$450
$160 4,200 - - - - - - - - $160
4,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,400
Cost:
$25,650
$5,490 148,100 $8,910 526 - - - - - - $5,490
148,100
kWh
$8,910
526
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,270
Cost:
$10,430
$1,720 46,300 $3,290 194 - - $180 - $80 - $1,720
46,300
kWh
$3,290
194
kW-months/year
-
-
MMBtu
$180
-
$
$80
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,930
Cost:
$15,400
$(-460) (-12,300) $(-290) (-17) $2,680 316 - - - - $(-460)
(-12,300)
kWh
$(-290)
(-17)
kW-months/year
$2,680
316
MMBtu
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,430
Cost:
$960
- - - - $1,430 168 - - - - -
-
kWh
-
-
kW-months/year
$1,430
168
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$38,700
Cost:
$112,590
$9,340 252,000 $18,540 1,108 $4,110 484 $180 - $6,530 - $9,340
252,000
kWh
$18,540
1,108
kW-months/year
$4,110
484
MMBtu
$180
-
$
$6,530
-
$
TOTAL IMPLEMENTED Savings:
$2,080
Cost:
$750
$1,440 38,800 $640 38 - - - - - - $1,440
38,800
kWh
$640
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost