IAC logo
IAC Assessment: CO0615
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0615
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2008
Principal Product Fabricated glass products
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 199,000
Annual Production 20,500 Thousand Feet
Production Hrs. Annual 4,680
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,102 1,562,946 kWh $0.03
Electricity Demand $116,921 7,373 kW-months/year $15.86
Electricity Fees $362 - $ -
Natural Gas $18,869 2,174 MMBtu $8.68
TOTAL ENERGY COSTS $186,254
RECOMMENDED SAVINGS* $27,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,450
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,560
Cost:
$12,000
- - $6,560 403 - - - - -
-
kWh
$6,560
403
kW-months/year
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,490
Cost:
$1,000
$6,490 139,700 - - - - - - $6,490
139,700
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,960
Cost:
$1,500
$1,260 27,200 $700 43 - - - - $1,260
27,200
kWh
$700
43
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,280
Cost:
$13,730
$5,890 126,900 $4,360 268 $200 - $(-170) - $5,890
126,900
kWh
$4,360
268
kW-months/year
$200
-
$
$(-170)
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,930
Cost:
$11,000
$680 14,600 $1,250 77 - - - - $680
14,600
kWh
$1,250
77
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$27,220
Cost:
$39,230
$14,320 308,400 $12,870 791 $200 - $(-170) - $14,320
308,400
kWh
$12,870
791
kW-months/year
$200
-
$
$(-170)
-
$
TOTAL IMPLEMENTED Savings:
$8,450
Cost:
$2,500
$7,750 166,900 $700 43 - - - - $7,750
166,900
kWh
$700
43
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost