IAC logo
IAC Assessment: CO0621
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0621
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2009
Principal Product Tungsten metal powder
NAICS 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399 - Primary Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 7
Plant Area (Sq.Ft.) 11,000
Annual Production 30,900 Pounds
Production Hrs. Annual 2,184
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,156 1,076,872 kWh $0.05
Electricity Demand $52,065 3,088 kW-months/year $16.86
Electricity Fees $384 - $ -
Natural Gas $52,649 5,505 MMBtu $9.56
TOTAL ENERGY COSTS $156,254
RECOMMENDED SAVINGS* $5,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,970
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$310
Cost:
$1,730
- - - - $310 58 - - - - -
-
kWh
-
-
kW-months/year
$310
58
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,570
Cost:
$3,690
$860 22,600 $650 33 - - $30 - $30 - $860
22,600
kWh
$650
33
kW-months/year
-
-
MMBtu
$30
-
$
$30
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,780
Cost:
$10,500
$560 14,600 $1,220 62 - - - - - - $560
14,600
kWh
$1,220
62
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$930
Cost:
$4,360
$310 8,200 $650 33 - - $10 - $(-40) - $310
8,200
kWh
$650
33
kW-months/year
-
-
MMBtu
$10
-
$
$(-40)
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$600
Cost:
$1,010
$350 9,300 $250 13 - - - - - - $350
9,300
kWh
$250
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$400
Cost:
$510
$90 2,400 $60 3 - - $130 - $120 - $90
2,400
kWh
$60
3
kW-months/year
-
-
MMBtu
$130
-
$
$120
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$360
Cost:
$650
$210 5,500 $150 8 - - - - - - $210
5,500
kWh
$150
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$5,950
Cost:
$22,450
$2,380 62,600 $2,980 152 $310 58 $170 - $110 - $2,380
62,600
kWh
$2,980
152
kW-months/year
$310
58
MMBtu
$170
-
$
$110
-
$
TOTAL IMPLEMENTED Savings:
$1,970
Cost:
$4,200
$950 25,000 $710 36 - - $160 - $150 - $950
25,000
kWh
$710
36
kW-months/year
-
-
MMBtu
$160
-
$
$150
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost