Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2010
Principal Product Motor oil
NAICS 324191 - Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992 - Lubricating Oils And Greases
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 197,400
Annual Production 520,000 Pieces
Production Hrs. Annual 5,460
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,338 1,052,928 kWh $0.04
Electricity Demand $49,727 2,999 kW-months/year $16.58
Electricity Fees $3,147 - $ -
Natural Gas $25,982 3,155 MMBtu $8.24
TOTAL ENERGY COSTS $124,194
RECOMMENDED SAVINGS* $20,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,630
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,000
Cost:
$19,665
$230 6,300 $770 47 - - - - $230
6,300
kWh
$770
47
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,360
Cost:
$3,977
$5,070 132,700 $6,930 401 $150 - $210 - $5,070
132,700
kWh
$6,930
401
kW-months/year
$150
-
$
$210
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,020
Cost:
$5,662
$590 15,900 $1,190 72 $30 - $210 - $590
15,900
kWh
$1,190
72
kW-months/year
$30
-
$
$210
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,920
Cost:
$27,104
$560 14,600 $1,360 77 - - - - $560
14,600
kWh
$1,360
77
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,710
Cost:
$8,757
$640 17,500 $1,140 69 $30 - $(-100) - $640
17,500
kWh
$1,140
69
kW-months/year
$30
-
$
$(-100)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,020
Cost:
$37,620
$110 3,000 $70 4 $380 - $460 - $110
3,000
kWh
$70
4
kW-months/year
$380
-
$
$460
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$600
Cost:
$3,108
$140 3,900 $250 15 $40 - $170 - $140
3,900
kWh
$250
15
kW-months/year
$40
-
$
$170
-
$
TOTAL RECOMMENDED Savings:
$20,630
Cost:
$105,893
$7,340 193,900 $11,710 685 $630 - $950 - $7,340
193,900
kWh
$11,710
685
kW-months/year
$630
-
$
$950
-
$
TOTAL IMPLEMENTED Savings:
$20,630
Cost:
$105,893
$7,340 193,900 $11,710 685 $630 - $950 - $7,340
193,900
kWh
$11,710
685
kW-months/year
$630
-
$
$950
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost