IAC logo
IAC Assessment: CO0635
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0635
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2010
Principal Product Semiconductor chemicals
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 75
Plant Area (Sq.Ft.) 215,000
Annual Production 48,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,747 4,506,002 kWh $0.04
Electricity Demand $163,678 10,618 kW-months/year $15.42
Electricity Fees $2,459 - $ -
Natural Gas $140,247 16,466 MMBtu $8.52
TOTAL ENERGY COSTS $491,131
RECOMMENDED SAVINGS* $40,090 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,050
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$21,490
Cost:
$12,290
$13,670 366,200 $7,820 502 - - - - - - $13,670
366,200
kWh
$7,820
502
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,520
Cost:
$10,350
$970 25,900 $550 36 - - - - - - $970
25,900
kWh
$550
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,100
Cost:
$1,510
$1,970 52,700 $1,130 72 - - - - - - $1,970
52,700
kWh
$1,130
72
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,170
Cost:
$11,190
$5,310 142,400 $2,910 187 - - $190 - $760 - $5,310
142,400
kWh
$2,910
187
kW-months/year
-
-
MMBtu
$190
-
$
$760
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,050
Cost:
$4,130
$140 3,700 $80 5 - - $300 - $530 - $140
3,700
kWh
$80
5
kW-months/year
-
-
MMBtu
$300
-
$
$530
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,760
Cost:
$10,240
$(-260) (-7,100) $(-160) (-10) $4,180 538 - - - - $(-260)
(-7,100)
kWh
$(-160)
(-10)
kW-months/year
$4,180
538
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,090
Cost:
$49,710
$21,800 583,800 $12,330 792 $4,180 538 $490 - $1,290 - $21,800
583,800
kWh
$12,330
792
kW-months/year
$4,180
538
MMBtu
$490
-
$
$1,290
-
$
TOTAL IMPLEMENTED Savings:
$1,050
Cost:
$4,130
$140 3,700 $80 5 - - $300 - $530 - $140
3,700
kWh
$80
5
kW-months/year
-
-
MMBtu
$300
-
$
$530
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost