IAC logo
IAC Assessment: CO0645
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0645
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2011
Principal Product Conveyors and Conveying Equipment
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 95,200
Annual Production 1,600 Pieces
Production Hrs. Annual 2,219
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,815 1,127,700 kWh $0.05
Electricity Demand $76,520 4,494 kW-months/year $17.03
Electricity Fees $2,012 - $ -
Natural Gas $52,085 6,836 MMBtu $7.62
TOTAL ENERGY COSTS $181,432
RECOMMENDED SAVINGS* $28,120 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,890
Cost:
$1,290
$1,780 39,000 $3,110 149 - - - - - - $1,780
39,000
kWh
$3,110
149
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$630
Cost:
$3,010
$180 3,900 $450 21 - - - - - - $180
3,900
kWh
$450
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,950
Cost:
$33,510
$5,420 119,000 $10,370 497 - - $190 - $(-30) - $5,420
119,000
kWh
$10,370
497
kW-months/year
-
-
MMBtu
$190
-
$
$(-30)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,930
Cost:
$5,260
$990 22,100 $1,940 93 - - $30 - $(-30) - $990
22,100
kWh
$1,940
93
kW-months/year
-
-
MMBtu
$30
-
$
$(-30)
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$2,000
Cost:
$21,500
$710 15,600 $1,290 62 - - - - - - $710
15,600
kWh
$1,290
62
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,560
Cost:
$7,980
$(-140) (-3,000) $(-80) (-4) $1,780 273 - - - - $(-140)
(-3,000)
kWh
$(-80)
(-4)
kW-months/year
$1,780
273
MMBtu
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$160
Cost:
$200
- - - - $160 24 - - - - -
-
kWh
-
-
kW-months/year
$160
24
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$28,120
Cost:
$72,750
$8,940 196,600 $17,080 818 $1,940 297 $220 - $(-60) - $8,940
196,600
kWh
$17,080
818
kW-months/year
$1,940
297
MMBtu
$220
-
$
$(-60)
-
$
TOTAL IMPLEMENTED Savings:
$21,000
Cost:
$35,000
$7,200 158,000 $13,480 646 $160 24 $190 - $(-30) - $7,200
158,000
kWh
$13,480
646
kW-months/year
$160
24
MMBtu
$190
-
$
$(-30)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost