IAC Assessment: CO0673
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2013
Principal Product Extruded plastic pellets and products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 28
Plant Area (Sq.Ft.) 115,500
Annual Production 8,760,000 Pounds
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,673 1,781,794 kWh $0.04
Electricity Demand $87,145 4,743 kW-months/year $18.37
Electricity Fees $4,779 - $ -
Natural Gas $21,822 3,422 MMBtu $6.38
TOTAL ENERGY COSTS $186,419
RECOMMENDED SAVINGS* $29,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,210
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,680
Cost:
$8,440
$4,120 97,100 $3,560 187 - - - - - - $4,120
97,100
kWh
$3,560
187
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,190
Cost:
$20,600
$3,210 75,600 $2,980 156 - - - - - - $3,210
75,600
kWh
$2,980
156
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$3,060
Cost:
$4,216
$1,740 41,100 $1,320 69 - - - - - - $1,740
41,100
kWh
$1,320
69
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,910
Cost:
$530
$1,560 36,800 $1,350 71 - - - - - - $1,560
36,800
kWh
$1,350
71
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,240
Cost:
-
- - - - - - $5,240 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,240
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,160
Cost:
$6,540
$2,450 57,700 $1,510 79 $60 - - - $140 - $2,450
57,700
kWh
$1,510
79
kW-months/year
$60
-
$
-
-
$
$140
-
$
TOTAL RECOMMENDED Savings:
$29,240
Cost:
$40,326
$13,080 308,300 $10,720 562 $60 - $5,240 - $140 - $13,080
308,300
kWh
$10,720
562
kW-months/year
$60
-
$
$5,240
-
$
$140
-
$
TOTAL IMPLEMENTED Savings:
$11,210
Cost:
$4,746
$3,300 77,900 $2,670 140 - - $5,240 - - - $3,300
77,900
kWh
$2,670
140
kW-months/year
-
-
$
$5,240
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost