IAC logo
IAC Assessment: CO0688
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0688
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2014
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 32,000
Annual Production 65,900 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,404 1,452,096 kWh $0.04
Electricity Demand $60,120 4,124 kW-months/year $14.58
Electricity Fees $1,484 - $ -
Natural Gas $43,989 7,763 MMBtu $5.67
TOTAL ENERGY COSTS $156,997
RECOMMENDED SAVINGS* $11,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,390
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$4,830
Cost:
$8,050
$3,500 79,500 $1,330 109 - - - - - - $3,500
79,500
kWh
$1,330
109
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,390
Cost:
$1,500
$1,730 39,400 $660 54 - - - - - - $1,730
39,400
kWh
$660
54
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,490
Cost:
$10,380
- - - - $2,490 417 - - - - -
-
kWh
-
-
kW-months/year
$2,490
417
MMBtu
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$610
Cost:
$2,270
$440 9,900 $170 14 - - - - - - $440
9,900
kWh
$170
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,160
Cost:
$3,140
$780 17,500 $290 24 - - $40 - $50 - $780
17,500
kWh
$290
24
kW-months/year
-
-
MMBtu
$40
-
$
$50
-
$
TOTAL RECOMMENDED Savings:
$11,480
Cost:
$25,340
$6,450 146,300 $2,450 201 $2,490 417 $40 - $50 - $6,450
146,300
kWh
$2,450
201
kW-months/year
$2,490
417
MMBtu
$40
-
$
$50
-
$
TOTAL IMPLEMENTED Savings:
$2,390
Cost:
$1,500
$1,730 39,400 $660 54 - - - - - - $1,730
39,400
kWh
$660
54
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost