IAC logo
IAC Assessment: CO0717
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0717
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2015
Principal Product Fire Trucks, Fans, Lighting Towers
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 160,000
Annual Production 3,000 Pieces
Production Hrs. Annual 4,550
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,715 924,300 kWh $0.04
Electricity Demand $77,993 3,822 kW-months/year $20.41
Electricity Fees $570 - $ -
Natural Gas $47,403 8,826 MMBtu $5.37
TOTAL ENERGY COSTS $163,681
RECOMMENDED SAVINGS* $17,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,160
Cost:
$2,130
$340 8,700 - - $820 235 - - - - - - $340
8,700
kWh
-
-
kW-months/year
$820
235
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$470
Cost:
$480
$190 5,000 $280 13 - - - - - - - - $190
5,000
kWh
$280
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$380
Cost:
$100
$380 9,800 - - - - - - - - - - $380
9,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,880
Cost:
$35,080
$2,130 55,100 $4,630 224 - - $90 - - - $1,030 - $2,130
55,100
kWh
$4,630
224
kW-months/year
-
-
MMBtu
$90
-
$
-
-
$
$1,030
-
$
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$3,660
Cost:
$13,800
$720 18,500 $2,940 142 - - - - - - - - $720
18,500
kWh
$2,940
142
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,270
Cost:
$1,000
- - - - - - - - $3,270 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,270
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,080
Cost:
$3,220
- - - - $1,080 309 - - - - - - -
-
kWh
-
-
kW-months/year
$1,080
309
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,900
Cost:
$55,810
$3,760 97,100 $7,850 379 $1,900 544 $90 - $3,270 - $1,030 - $3,760
97,100
kWh
$7,850
379
kW-months/year
$1,900
544
MMBtu
$90
-
$
$3,270
-
$
$1,030
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost