IAC logo
IAC Assessment: CO0722
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0722
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Fabricated steel storage tanks
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 50,335
Annual Production 1,300,000 Units
Production Hrs. Annual 2,210
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,348 511,040 kWh $0.04
Electricity Demand $61,857 2,940 kW-months/year $21.04
Electricity Fees $1,755 - $ -
Natural Gas $42,784 4,890 MMBtu $8.75
TOTAL ENERGY COSTS $126,744
RECOMMENDED SAVINGS* $33,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,390
Cost:
-
- - $2,390 120 - - - - - - - - -
-
kWh
$2,390
120
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$880
Cost:
$110
$420 11,500 $460 23 - - - - - - - - $420
11,500
kWh
$460
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,500
Cost:
$21,280
$4,240 115,400 $10,100 507 - - $(-920) - - - $1,080 - $4,240
115,400
kWh
$10,100
507
kW-months/year
-
-
MMBtu
$(-920)
-
$
-
-
$
$1,080
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,910
Cost:
$560
- - - - $5,910 928 - - - - - - -
-
kWh
-
-
kW-months/year
$5,910
928
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$4,830
Cost:
$6,980
- - - - $4,830 759 - - - - - - -
-
kWh
-
-
kW-months/year
$4,830
759
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,180
Cost:
-
$(-3,690) - $5,520 260 - - - - $350 - - - $(-3,690)
-
kWh
$5,520
260
kW-months/year
-
-
MMBtu
-
-
$
$350
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$920
Cost:
$5,520
$330 8,400 $780 37 - - $10 - - - $(-200) - $330
8,400
kWh
$780
37
kW-months/year
-
-
MMBtu
$10
-
$
-
-
$
$(-200)
-
$
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,900
Cost:
$500
- - - - - - - - $1,900 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,900
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$33,510
Cost:
$34,950
$1,300 135,300 $19,250 947 $10,740 1,687 $(-910) - $2,250 - $880 - $1,300
135,300
kWh
$19,250
947
kW-months/year
$10,740
1,687
MMBtu
$(-910)
-
$
$2,250
-
$
$880
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost