IAC logo
IAC Assessment: CO0723
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0723
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Bison and beef processing
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 52
Plant Area (Sq.Ft.) 31,750
Annual Production 52,000 Units
Production Hrs. Annual 2,145
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,067 3,322,326 kWh $0.04
Electricity Demand $177,614 8,111 kW-months/year $21.90
Electricity Fees $597 - $ -
Natural Gas $120,699 39,132 MMBtu $3.08
TOTAL ENERGY COSTS $435,977
RECOMMENDED SAVINGS* $23,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,520
Cost:
$3,200
$1,330 33,500 $1,190 52 - - - - - - $1,330
33,500
kWh
$1,190
52
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,250
Cost:
$140
$690 17,600 $560 24 - - - - - - $690
17,600
kWh
$560
24
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,530
Cost:
$20,440
$7,450 187,700 $8,530 372 $290 - - - $(-1,740) - $7,450
187,700
kWh
$8,530
372
kW-months/year
$290
-
$
-
-
$
$(-1,740)
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,280
Cost:
$1,000
- - - - - - $5,280 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,280
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,580
Cost:
$24,780
$9,470 238,800 $10,280 448 $290 - $5,280 - $(-1,740) - $9,470
238,800
kWh
$10,280
448
kW-months/year
$290
-
$
$5,280
-
$
$(-1,740)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost