IAC logo
IAC Assessment: CO0725
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0725
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Tungsten Carbide Powder
NAICS 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3341 - Secondary Nonferrous Metals
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 51,200
Annual Production 500 Tons
Production Hrs. Annual 4,160
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,342 1,875,960 kWh $0.08
Electricity Demand $88,396 9,466 kW-months/year $9.34
Electricity Fees $324 - $ -
Natural Gas $17,436 3,031 MMBtu $5.75
TOTAL ENERGY COSTS $299,188
RECOMMENDED SAVINGS* $34,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$8,690
Cost:
$100
$3,080 38,700 $5,610 601 - - - - - - - - $3,080
38,700
kWh
$5,610
601
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,970
Cost:
$1,390
$5,210 65,500 $1,760 189 - - - - - - - - $5,210
65,500
kWh
$1,760
189
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,010
Cost:
$620
$2,140 26,900 $3,870 414 - - - - - - - - $2,140
26,900
kWh
$3,870
414
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$5,930
Cost:
$24,000
$(-510) (-6,400) $(-750) (-80) $(-1,110) (-194) $8,300 91,200 - - - - $(-510)
(-6,400)
kWh
$(-750)
(-80)
kW-months/year
$(-1,110)
(-194)
MMBtu
$8,300
91,200
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,040
Cost:
$13,050
$2,950 37,100 $1,030 110 - - - - $30 - $30 - $2,950
37,100
kWh
$1,030
110
kW-months/year
-
-
MMBtu
-
-
lb
$30
-
$
$30
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,050
Cost:
$2,950
$2,380 30,000 $670 72 - - - - - - - - $2,380
30,000
kWh
$670
72
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,690
Cost:
$42,110
$15,250 191,800 $12,190 1,306 $(-1,110) (-194) $8,300 91,200 $30 - $30 - $15,250
191,800
kWh
$12,190
1,306
kW-months/year
$(-1,110)
(-194)
MMBtu
$8,300
91,200
lb
$30
-
$
$30
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost