IAC Assessment: CO0727
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0727
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2016
Principal Product Injection Molded Livestock Tags
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 66,300
Annual Production 940,500 Pounds
Production Hrs. Annual 6,240
Location (State) WY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,144 1,727,080 kWh $0.04
Electricity Demand $74,560 4,073 kW-months/year $18.31
Electricity Fees $1,104 - $ -
Natural Gas $14,523 2,160 MMBtu $6.72
TOTAL ENERGY COSTS $156,331
RECOMMENDED SAVINGS* $19,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,370
Cost:
$150
$1,410 37,200 $960 51 - - - - $1,410
37,200
kWh
$960
51
kW-months/year
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$970
Cost:
$1,000
$(-5,940) (-152,500) $6,910 359 - - - - $(-5,940)
(-152,500)
kWh
$6,910
359
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,140
Cost:
$26,760
$6,330 160,100 $8,210 421 $70 - $(-1,470) - $6,330
160,100
kWh
$8,210
421
kW-months/year
$70
-
$
$(-1,470)
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,660
Cost:
$2,570
$740 18,700 $1,870 96 $10 - $40 - $740
18,700
kWh
$1,870
96
kW-months/year
$10
-
$
$40
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$550
Cost:
$2,280
$280 7,200 $270 14 - - - - $280
7,200
kWh
$270
14
kW-months/year
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$250
Cost:
$280
$150 4,000 $100 6 - - - - $150
4,000
kWh
$100
6
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,940
Cost:
$33,040
$2,970 74,700 $18,320 947 $80 - $(-1,430) - $2,970
74,700
kWh
$18,320
947
kW-months/year
$80
-
$
$(-1,430)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost