IAC Assessment: CO0739
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0739
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2020
Principal Product environmental field sampling equipment, remediation equipment, and extrusion products (tubing)
NAICS 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823 - Process Control Instruments
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 230,000
Annual Production 1 Units
Production Hrs. Annual 6,000
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,212 1,689,440 kWh $0.04
Electricity Demand $86,197 4,384 kW-months/year $19.66
Electricity Fees $454 - $ -
Natural Gas $25,923 6,149 MMBtu $4.22
TOTAL ENERGY COSTS $173,786
RECOMMENDED SAVINGS* $26,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,448
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,400
Cost:
$11,069
$2,588 66,000 $2,812 144 $2,588
66,000
kWh
$2,812
144
kW-months/year
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,357
Cost:
$12,500
$2,465 66,576 $1,892 96 $2,465
66,576
kWh
$1,892
96
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$291
Cost:
$185
$291 7,862 - - $291
7,862
kWh
-
-
kW-months/year
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,067
Cost:
-
$1,235 32,045 $2,832 144 $1,235
32,045
kWh
$2,832
144
kW-months/year
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,541
Cost:
$3,605
$1,541 41,609 - - $1,541
41,609
kWh
-
-
kW-months/year
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,090
Cost:
-
- - $11,090 564 -
-
kWh
$11,090
564
kW-months/year
TOTAL RECOMMENDED Savings:
$26,746
Cost:
$27,359
$8,120 214,092 $18,626 948 $8,120
214,092
kWh
$18,626
948
kW-months/year
TOTAL IMPLEMENTED Savings:
$15,448
Cost:
$185
$1,526 39,907 $13,922 708 $1,526
39,907
kWh
$13,922
708
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand