Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Case Western Reserve University |
---|---|
Assessment Year | 2020 |
Principal Product | Injection Molding for Gas, Automotive, Health and Beauty |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 4 Tons |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $170,869 | 2,994,746 | kWh | $0.06 |
Electricity Demand | $54,083 | 6,678 | kW-months/year | $8.10 |
Electricity Fees | $2,856 | - | $ | - |
Natural Gas | $1,458 | 271 | MMBtu | $5.38 |
TOTAL ENERGY COSTS | $230,749 | |||
RECOMMENDED SAVINGS* | $140,647 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,772 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Primary Product | Electricity Usage | Electricity Demand | Electricity Fees | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $3,565 Cost: $1,858 |
$3,565 | 62,544 | - | - | - | - | - | - |
$3,565 62,544 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $104,454 Cost: $200,550 |
$10,602 | 186,017 | $(-10,965) | (-1,349) | - | - | $104,817 | - |
$10,602 186,017 kWh |
$(-10,965) (-1,349) kW-months/year |
- - $ |
$104,817 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $941 Cost: $105 |
$941 | 16,515 | - | - | - | - | - | - |
$941 16,515 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $656 Cost: $810 |
$656 | 11,502 | - | - | - | - | - | - |
$656 11,502 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $583 Cost: $1,600 |
$583 | 10,235 | - | - | - | - | - | - |
$583 10,235 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $13,673 Cost: $2,250 |
- | - | - | - | $13,673 | - | - | - |
- - kWh |
- - kW-months/year |
$13,673 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,683 Cost: $10,280 |
$9,846 | 172,737 | $2,935 | 361 | $902 | - | - | - |
$9,846 172,737 kWh |
$2,935 361 kW-months/year |
$902 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,092 Cost: $1,969 |
$3,092 | 54,250 | - | - | - | - | - | - |
$3,092 54,250 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $140,647 Cost: $219,422 |
$29,285 | 513,800 | $(-8,030) | (-988) | $14,575 | - | $104,817 | - | $29,285 513,800 kWh |
$(-8,030) (-988) kW-months/year |
$14,575 - $ |
$104,817 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,772 Cost: $13,843 |
$14,935 | 262,031 | $2,935 | 361 | $902 | - | - | - | $14,935 262,031 kWh |
$2,935 361 kW-months/year |
$902 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Primary Product | Electricity Usage | Electricity Demand | Electricity Fees | Primary Product |