Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Case Western Reserve University
Assessment Year 2022
Principal Product Frozen buns
NAICS 493120 - Refrigerated Warehousing and Storage
SIC 4222 - Refrigerated Warehousing And Storage
Sales >$500,000,000
# of Employees 215
Plant Area (Sq.Ft.) 158,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,640
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,391 4,231,929 kWh $0.06
Electricity Demand $54,335 8,064 kW-months/year $6.74
Electricity Fees $1,810 - $ -
Natural Gas $21,126 3,237 MMBtu $6.53
TOTAL ENERGY COSTS $369,060
RECOMMENDED SAVINGS* $275,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Water Usage Administrative Changes Electricity Usage Water Usage Administrative Changes
$ kWh $ Tgal $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,407
Cost:
$100
$1,407 21,991 - - - - $1,407
21,991
kWh
-
-
Tgal
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,378
Cost:
$47,373
$17,378 271,532 - - - - $17,378
271,532
kWh
-
-
Tgal
-
-
$
03: 2.3142 USER BATTERY STORAGE FOR POWER QUALITY ISSUES Savings:
$230,341
Cost:
$287,555
- - - - $230,341 - -
-
kWh
-
-
Tgal
$230,341
-
$
04: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$7,380
Cost:
-
- - - - $7,380 - -
-
kWh
-
-
Tgal
$7,380
-
$
05: 4.426 MODIFY WORKLOAD Savings:
$16,860
Cost:
-
$16,860 262,215 - - - - $16,860
262,215
kWh
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$929
Cost:
$1,866
$929 14,509 - - - - $929
14,509
kWh
-
-
Tgal
-
-
$
07: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$1,505
Cost:
$2,582
- - $1,667 405 $(-162) - -
-
kWh
$1,667
405
Tgal
$(-162)
-
$
TOTAL RECOMMENDED Savings:
$275,801
Cost:
$339,476
$36,574 570,247 $1,667 405 $237,560 - $36,574
570,247
kWh
$1,667
405
Tgal
$237,560
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ Tgal $ $
Electricity Usage Water Usage Administrative Changes Electricity Usage Water Usage Administrative Changes