Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2013 |
Principal Product | vinyl windows and sliding doors |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3999 - Manufacturing Industries, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 70,000 Pieces |
Production Hrs. Annual | 2,350 |
Location (State) | DE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $102,678 | 1,060,151 | kWh | $0.10 |
Electricity Demand | $2,189 | 574 | kW-months/year | $3.81 |
Electricity Fees | $5,479 | - | $ | - |
Natural Gas | $11,796 | 949 | MMBtu | $12.43 |
TOTAL ENERGY COSTS | $130,962 | |||
RECOMMENDED SAVINGS* | $34,481 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,116 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Electricity Usage | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $5,567 Cost: $100 |
$5,567 | 57,396 | - | - |
$5,567 57,396 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $7,275 Cost: - |
$7,275 | 75,000 | - | - |
$7,275 75,000 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,698 Cost: $3,500 |
$1,698 | 17,500 | - | - |
$1,698 17,500 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $1,094 Cost: $2,000 |
$1,094 | 11,280 | - | - |
$1,094 11,280 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,271 Cost: $49,280 |
$10,271 | 105,600 | - | - |
$10,271 105,600 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,455 Cost: $20,000 |
$1,455 | 15,040 | - | - |
$1,455 15,040 kWh |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $7,121 Cost: $10,000 |
$127 | 1,312 | $6,994 | 512,750 |
$127 1,312 kWh |
$6,994 512,750 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,481 Cost: $84,880 |
$27,487 | 283,128 | $6,994 | 512,750 | $27,487 283,128 kWh |
$6,994 512,750 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,116 Cost: $33,600 |
$16,122 | 166,248 | $6,994 | 512,750 | $16,122 166,248 kWh |
$6,994 512,750 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Electricity Usage | Water Disposal |