IAC Assessment: DL0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2014
Principal Product Beer and Soda
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 19,100
Annual Production 35,000 BBL
Production Hrs. Annual 4,056
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,383 680,560 kWh $0.11
Natural Gas $59,606 8,870 MMBtu $6.72
TOTAL ENERGY COSTS $198,288
RECOMMENDED SAVINGS* $47,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,510
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Water Consumption Electricity Usage Natural Gas Water Disposal Water Consumption
$ kWh $ MMBtu $ Tgal $ Tgal
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$17,190
Cost:
$20,000
- - $7,800 1,161 $6,280 1,036 $3,110 - -
-
kWh
$7,800
1,161
MMBtu
$6,280
1,036
Tgal
$3,110
-
Tgal
02: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$14,240
Cost:
$5,460
$14,240 127,170 - - - - - - $14,240
127,170
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,900
Cost:
$38,400
$5,900 52,730 - - - - - - $5,900
52,730
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$890
Cost:
$2,220
- - $890 132 - - - - -
-
kWh
$890
132
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,520
Cost:
$8,430
$500 4,460 $1,020 152 - - - - $500
4,460
kWh
$1,020
152
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$745
Cost:
$160
- - $745 111 - - - - -
-
kWh
$745
111
MMBtu
-
-
Tgal
-
-
Tgal
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,350
Cost:
$6,300
- - $2,350 350 - - - - -
-
kWh
$2,350
350
MMBtu
-
-
Tgal
-
-
Tgal
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$970
Cost:
$1,200
- - $970 145 - - - - -
-
kWh
$970
145
MMBtu
-
-
Tgal
-
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$245
Cost:
$2,280
$245 2,195 - - - - - - $245
2,195
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,820
Cost:
$10,075
$2,820 25,200 - - - - - - $2,820
25,200
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$640
Cost:
$1,040
$640 5,710 - - - - - - $640
5,710
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$47,510
Cost:
$95,565
$24,345 217,465 $13,775 2,051 $6,280 1,036 $3,110 - $24,345
217,465
kWh
$13,775
2,051
MMBtu
$6,280
1,036
Tgal
$3,110
-
Tgal
TOTAL IMPLEMENTED Savings:
$20,510
Cost:
$27,500
- - $11,120 1,656 $6,280 1,036 $3,110 - -
-
kWh
$11,120
1,656
MMBtu
$6,280
1,036
Tgal
$3,110
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ Tgal
Electricity Usage Natural Gas Water Disposal Water Consumption Electricity Usage Natural Gas Water Disposal Water Consumption