IAC logo
IAC Assessment: DL0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2015
Principal Product Magnetic Metal Components
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677 - Electronic Coils And Transformers
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 52,000
Annual Production 100 Tons
Production Hrs. Annual 6,000
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,140 1,850,226 kWh $0.11
Electricity Demand $12,889 5,547 kW-months/year $2.32
Electricity Fees $24,699 - $ -
Natural Gas $23,397 3,355 MMBtu $6.97
TOTAL ENERGY COSTS $273,125
RECOMMENDED SAVINGS* $38,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,330
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$15,210
Cost:
$630
$14,790 128,610 $420 180 - - $14,790
128,610
kWh
$420
180
kW-months/year
-
-
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,780
Cost:
-
$1,780 15,500 - - - - $1,780
15,500
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,060
Cost:
$35
- - - - $6,060 870 -
-
kWh
-
-
kW-months/year
$6,060
870
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,900
Cost:
$1,250
$3,910 34,010 $990 425 - - $3,910
34,010
kWh
$990
425
kW-months/year
-
-
MMBtu
05: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$1,140
Cost:
$40
$300 2,830 - - $840 120 $300
2,830
kWh
-
-
kW-months/year
$840
120
MMBtu
06: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$870
Cost:
$50
- - - - $870 125 -
-
kWh
-
-
kW-months/year
$870
125
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,930
Cost:
$7,440
$4,440 38,570 $490 210 - - $4,440
38,570
kWh
$490
210
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$470
Cost:
$1,430
$460 4,000 $10 6 - - $460
4,000
kWh
$10
6
kW-months/year
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$600
Cost:
$3,200
$570 4,990 $30 14 - - $570
4,990
kWh
$30
14
kW-months/year
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$480
Cost:
$1,200
$440 3,850 $40 17 - - $440
3,850
kWh
$40
17
kW-months/year
-
-
MMBtu
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,290
Cost:
$29,215
$2,290 19,940 - - - - $2,290
19,940
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$38,730
Cost:
$44,490
$28,980 252,300 $1,980 852 $7,770 1,115 $28,980
252,300
kWh
$1,980
852
kW-months/year
$7,770
1,115
MMBtu
TOTAL IMPLEMENTED Savings:
$16,330
Cost:
$13,395
$7,990 69,740 $570 247 $7,770 1,115 $7,990
69,740
kWh
$570
247
kW-months/year
$7,770
1,115
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas