IAC Assessment: DL0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2015
Principal Product Waste Water Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 30
Plant Area (Sq.Ft.) 290,000
Annual Production 3,630,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $383,375 4,931,878 kWh $0.08
Electricity Demand $35,669 11,581 kW-months/year $3.08
Electricity Fees $1,594 - $ -
TOTAL ENERGY COSTS $420,638
RECOMMENDED SAVINGS* $83,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,830
Cost:
$940
$5,530 70,910 $300 97 $5,530
70,910
kWh
$300
97
kW-months/year
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$42,210
Cost:
$37,500
$40,050 513,400 $2,160 700 $40,050
513,400
kWh
$2,160
700
kW-months/year
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,350
Cost:
$3,000
$3,350 42,950 - - $3,350
42,950
kWh
-
-
kW-months/year
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,140
Cost:
$3,000
$3,140 40,200 - - $3,140
40,200
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,590
Cost:
$2,950
$1,510 19,325 $80 26 $1,510
19,325
kWh
$80
26
kW-months/year
06: 2.4311 RECOVER MECHANICAL ENERGY Savings:
$7,880
Cost:
$20,000
$7,480 95,950 $400 131 $7,480
95,950
kWh
$400
131
kW-months/year
07: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$19,680
Cost:
$217,600
$19,680 252,270 - - $19,680
252,270
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$83,680
Cost:
$284,990
$80,740 1,035,005 $2,940 954 $80,740
1,035,005
kWh
$2,940
954
kW-months/year
TOTAL IMPLEMENTED Savings:
$43,800
Cost:
$40,450
$41,560 532,725 $2,240 726 $41,560
532,725
kWh
$2,240
726
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand