IAC Assessment: DL0161
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Waste Water Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 50
Plant Area (Sq.Ft.) 900,000
Annual Production 3,285,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $567,697 6,381,840 kWh $0.09
TOTAL ENERGY COSTS $2,367,697
RECOMMENDED SAVINGS* $1,205,745 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,665
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$9,700
Cost:
$6,000
$9,700 109,000 - - $9,700
109,000
kWh
-
-
lb
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$144,770
Cost:
$285,230
$144,770 1,626,660 - - $144,770
1,626,660
kWh
-
-
lb
03: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$6,400
Cost:
$28,700
$6,400 71,880 - - $6,400
71,880
kWh
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,215
Cost:
$58,570
$12,215 137,230 - - $12,215
137,230
kWh
-
-
lb
05: 2.9141 Install Anaerobic Digester Savings:
$990,000
Cost:
$6,000,000
- - $990,000 3,960,000 -
-
kWh
$990,000
3,960,000
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,450
Cost:
$21,270
$2,450 27,525 - - $2,450
27,525
kWh
-
-
lb
07: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$40,210
Cost:
$390,000
$40,210 451,820 - - $40,210
451,820
kWh
-
-
lb
TOTAL RECOMMENDED Savings:
$1,205,745
Cost:
$6,789,770
$215,745 2,424,115 $990,000 3,960,000 $215,745
2,424,115
kWh
$990,000
3,960,000
lb
TOTAL IMPLEMENTED Savings:
$14,665
Cost:
$79,840
$14,665 164,755 - - $14,665
164,755
kWh
-
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)