IAC logo
IAC Assessment: DL0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2017
Principal Product RF and Microwave Technology
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 100,000
Annual Production 5,000,000 Units
Production Hrs. Annual 4,806
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,147 3,541,902 kWh $0.07
Electricity Demand $50,243 7,538 kW-months/year $6.67
Electricity Fees $40,330 - $ -
Natural Gas $5,413 382 MMBtu $14.17
TOTAL ENERGY COSTS $357,133
RECOMMENDED SAVINGS* $60,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,591
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$20,880
Cost:
-
$20,880 282,000 - - $20,880
282,000
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,435
Cost:
$15,000
$4,435 50,400 - - $4,435
50,400
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,100
Cost:
$9,375
$5,100 58,000 - - $5,100
58,000
kWh
-
-
MMBtu
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,676
Cost:
$1,375
$1,676 19,049 - - $1,676
19,049
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,364
Cost:
$654
$1,032 11,728 $1,332 94 $1,032
11,728
kWh
$1,332
94
MMBtu
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$17,600
Cost:
$5,950
$17,600 200,000 - - $17,600
200,000
kWh
-
-
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,800
Cost:
$3,940
$8,800 100,000 - - $8,800
100,000
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$60,855
Cost:
$36,294
$59,523 721,177 $1,332 94 $59,523
721,177
kWh
$1,332
94
MMBtu
TOTAL IMPLEMENTED Savings:
$44,591
Cost:
$22,325
$44,591 551,449 - - $44,591
551,449
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas