IAC Assessment: DL0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2023
Principal Product Sewer water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 47
Plant Area (Sq.Ft.) 650,000
Annual Production 29,053,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,722,287 18,898,075 kWh $0.09
Electricity Demand $270,252 46,525 kW-months/year $5.81
Electricity Fees $7,898 - $ -
Natural Gas $630,860 65,052 MMBtu $9.70
TOTAL ENERGY COSTS $2,631,297
RECOMMENDED SAVINGS* $1,028,242 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $284,896
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$577,300
Cost:
$470,000
$577,300 5,498,000 $577,300
5,498,000
kWh
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$124,500
Cost:
$181,000
$124,500 1,186,000 $124,500
1,186,000
kWh
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$93,960
Cost:
$250,000
$93,960 894,900 $93,960
894,900
kWh
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$70,880
Cost:
$80,000
$70,880 675,000 $70,880
675,000
kWh
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$48,610
Cost:
-
$48,610 463,000 $48,610
463,000
kWh
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,154
Cost:
$50,000
$12,154 115,750 $12,154
115,750
kWh
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,672
Cost:
-
$5,672 54,020 $5,672
54,020
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$70,620
Cost:
$19,500
$70,620 672,571 $70,620
672,571
kWh
09: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$24,546
Cost:
$50,000
$24,546 233,775 $24,546
233,775
kWh
TOTAL RECOMMENDED Savings:
$1,028,242
Cost:
$1,100,500
$1,028,242 9,793,016 $1,028,242
9,793,016
kWh
TOTAL IMPLEMENTED Savings:
$284,896
Cost:
$481,000
$284,896 2,713,670 $284,896
2,713,670
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage