Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2023 |
Principal Product | Carbonated beverages |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $50,000,000-$100,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 30,607 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $241,977 | 4,646,411 | kWh | $0.05 |
Electricity Demand | $36,061 | 9,590 | kW-months/year | $3.76 |
Electricity Fees | $4,457 | - | $ | - |
Natural Gas | $79,726 | 17,664 | MMBtu | $4.51 |
TOTAL ENERGY COSTS | $362,221 | |||
RECOMMENDED SAVINGS* | $90,374 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,671 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $496 Cost: - |
$430 | 8,271 | $66 | 18 | - | - | - | - |
$430 8,271 kWh |
$66 18 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $922 Cost: $520 |
- | - | - | - | $922 | 204 | - | - |
- - kWh |
- - kW-months/year |
$922 204 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $6,246 Cost: $4,000 |
$238 | 4,578 | $37 | 10 | $5,971 | 1,321 | - | - |
$238 4,578 kWh |
$37 10 kW-months/year |
$5,971 1,321 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $5,827 Cost: - |
$5,827 | 97,119 | - | - | - | - | - | - |
$5,827 97,119 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,974 Cost: $10,600 |
$6,044 | 116,237 | $930 | 247 | - | - | - | - |
$6,044 116,237 kWh |
$930 247 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT |
Savings: $11,196 Cost: $50,000 |
- | - | - | - | $11,196 | 2,477 | - | - |
- - kWh |
- - kW-months/year |
$11,196 2,477 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $2,856 Cost: $16,145 |
- | - | - | - | $2,856 | 632 | - | - |
- - kWh |
- - kW-months/year |
$2,856 632 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,178 Cost: $10,128 |
$3,621 | 69,642 | $557 | 148 | - | - | - | - |
$3,621 69,642 kWh |
$557 148 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $51,679 Cost: $50,000 |
- | - | - | - | - | - | $51,679 | 3,040 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$51,679 3,040 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $90,374 Cost: $141,393 |
$16,160 | 295,847 | $1,590 | 422 | $20,945 | 4,634 | $51,679 | 3,040 | $16,160 295,847 kWh |
$1,590 422 kW-months/year |
$20,945 4,634 MMBtu |
$51,679 3,040 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,671 Cost: $70,728 |
$15,922 | 291,269 | $1,553 | 412 | $11,196 | 2,477 | - | - | $15,922 291,269 kWh |
$1,553 412 kW-months/year |
$11,196 2,477 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage |