IAC logo
IAC Assessment: DS0001
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0001
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1994
Principal Product Signs
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $5,000,000-$10,000,000
# of Employees 117
Plant Area (Sq.Ft.) 72,500
Annual Production 49,000 Pieces
Production Hrs. Annual 3,380
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,624 726,553 kWh $0.04
Natural Gas $20,240 4,712 MMBtu $4.30
TOTAL ENERGY COSTS $51,864
RECOMMENDED SAVINGS* $19,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,990
Cost:
$12,650
$2,990 68,581 - - $2,990
68,581
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$70
Cost:
$120
$70 1,465 - - $70
1,465
kWh
-
-
MMBtu
03: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$140
Cost:
$280
- - $140 28 -
-
kWh
$140
28
MMBtu
04: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$1,130
Cost:
$8,200
- - $1,130 217 -
-
kWh
$1,130
217
MMBtu
05: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$740
Cost:
$20
- - $740 142 -
-
kWh
$740
142
MMBtu
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$4,760
Cost:
$44,950
- - $4,760 916 -
-
kWh
$4,760
916
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$130
Cost:
$690
$130 3,224 - - $130
3,224
kWh
-
-
MMBtu
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$9,150
Cost:
$34,800
- - $9,150 2,127 -
-
kWh
$9,150
2,127
MMBtu
TOTAL RECOMMENDED Savings:
$19,110
Cost:
$101,710
$3,190 73,270 $15,920 3,430 $3,190
73,270
kWh
$15,920
3,430
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu