IAC logo
IAC Assessment: DS0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1995
Principal Product Beef patties, meat snacks, sausage products
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 75,825
Annual Production 25,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,431 3,579,426 kWh $0.05
LPG $59,811 15,388 MMBtu $3.89
TOTAL ENERGY COSTS $245,242
RECOMMENDED SAVINGS* $53,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,635
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,602
Cost:
$2,709
$3,602 79,132 - - $3,602
79,132
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,911
Cost:
$8,264
$5,911 93,787 - - $5,911
93,787
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$631
Cost:
$300
$631 19,637 - - $631
19,637
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,479
Cost:
$2,413
$2,479 58,324 - - $2,479
58,324
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,377
Cost:
$104
- - $1,377 354 -
-
kWh
$1,377
354
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$122
Cost:
$112
- - $122 31 -
-
kWh
$122
31
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,492
Cost:
$3,107
- - $1,492 383 -
-
kWh
$1,492
383
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$850
Cost:
$284
$850 25,498 - - $850
25,498
kWh
-
-
MMBtu
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$30,890
Cost:
$268,600
$30,890 - - - $30,890
-
kWh
-
-
MMBtu
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,581
Cost:
$16,000
- - $6,581 1,691 -
-
kWh
$6,581
1,691
MMBtu
TOTAL RECOMMENDED Savings:
$53,935
Cost:
$301,893
$44,363 276,378 $9,572 2,459 $44,363
276,378
kWh
$9,572
2,459
MMBtu
TOTAL IMPLEMENTED Savings:
$9,635
Cost:
$11,085
$9,513 172,919 $122 31 $9,513
172,919
kWh
$122
31
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG