Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1995 |
Principal Product | Hydraulic Steel Tube Assemblies |
NAICS | n/a |
SIC | 3492 - Fluid Power Valves & Hose Fittings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 155 |
Plant Area (Sq.Ft.) | 47,590 |
Annual Production | 80,000 Pieces |
Production Hrs. Annual | 7,774 |
Location (State) | SD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,867 | 969,812 | kWh | $0.04 |
Natural Gas | $17,462 | 4,092 | MMBtu | $4.27 |
TOTAL ENERGY COSTS | $52,329 | |||
RECOMMENDED SAVINGS* | $27,616 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,413 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Water Consumption | Electricity Usage | Natural Gas | Water Disposal | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,389 Cost: $14,455 |
$4,389 | 126,026 | - | - | - | - | - | - |
$4,389 126,026 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $203 Cost: $400 |
$203 | 6,741 | - | - | - | - | - | - |
$203 6,741 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $808 Cost: $2,657 |
$808 | 17,878 | - | - | - | - | - | - |
$808 17,878 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $172 Cost: $240 |
$172 | 5,862 | - | - | - | - | - | - |
$172 5,862 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $13,615 Cost: $13,000 |
$(-176) | (-5,862) | - | - | $10,056 | 26,864,000 | $3,735 | - |
$(-176) (-5,862) kWh |
- - MMBtu |
$10,056 26,864,000 Tgal |
$3,735 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $7,763 Cost: $14,400 |
- | - | $7,763 | 1,805 | - | - | - | - |
- - kWh |
$7,763 1,805 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $666 Cost: $600 |
- | - | $666 | 155 | - | - | - | - |
- - kWh |
$666 155 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,616 Cost: $45,752 |
$5,396 | 150,645 | $8,429 | 1,960 | $10,056 | 26,864,000 | $3,735 | - | $5,396 150,645 kWh |
$8,429 1,960 MMBtu |
$10,056 26,864,000 Tgal |
$3,735 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,413 Cost: $45,352 |
$5,193 | 143,904 | $8,429 | 1,960 | $10,056 | 26,864,000 | $3,735 | - | $5,193 143,904 kWh |
$8,429 1,960 MMBtu |
$10,056 26,864,000 Tgal |
$3,735 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Water Consumption | Electricity Usage | Natural Gas | Water Disposal | Water Consumption |