IAC logo
IAC Assessment: DS0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1995
Principal Product Tree Delimbers
NAICS n/a
SIC 3553 - Woodworking Machinery
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 33,488
Annual Production 42 Units
Production Hrs. Annual 3,250
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,665 378,370 kWh $0.11
Natural Gas $3,255 2,432 MMBtu $1.34
TOTAL ENERGY COSTS $45,920
RECOMMENDED SAVINGS* $114,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $108,676
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,832
Cost:
$4,110
$1,832 21,981 - - - - $1,832
21,981
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$340
Cost:
$943
$340 3,517 - - - - $340
3,517
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$471
Cost:
$276
$471 2,345 - - - - $471
2,345
kWh
-
-
MMBtu
-
-
$
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$3,634
Cost:
$6,400
$3,634 26,084 - - - - $3,634
26,084
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,825
Cost:
$1,350
- - $2,825 673 - - -
-
kWh
$2,825
673
MMBtu
-
-
$
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$5,032
Cost:
$3,336
- - $5,032 1,198 - - -
-
kWh
$5,032
1,198
MMBtu
-
-
$
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$98,404
Cost:
$36,882
$3,377 39,273 $3,255 774 $91,772 - $3,377
39,273
kWh
$3,255
774
MMBtu
$91,772
-
$
08: 2.7314 REDUCE VENTILATION AIR Savings:
$2,075
Cost:
$150
$1,016 11,723 $1,059 252 - - $1,016
11,723
kWh
$1,059
252
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$114,613
Cost:
$53,447
$10,670 104,923 $12,171 2,897 $91,772 - $10,670
104,923
kWh
$12,171
2,897
MMBtu
$91,772
-
$
TOTAL IMPLEMENTED Savings:
$108,676
Cost:
$42,661
$4,733 54,513 $12,171 2,897 $91,772 - $4,733
54,513
kWh
$12,171
2,897
MMBtu
$91,772
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes