IAC Assessment: DS0044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1995
Principal Product Livestock Feed
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 50,769
Annual Production 138,000 Tons
Production Hrs. Annual 5,520
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,630 3,008,793 kWh $0.05
Natural Gas $33,995 15,027 MMBtu $2.26
TOTAL ENERGY COSTS $177,625
RECOMMENDED SAVINGS* $10,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,693
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,508
Cost:
$4,325
$2,508 57,737 - - $2,508
57,737
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$570
Cost:
$400
$570 15,533 - - $570
15,533
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,828
Cost:
$15,870
$3,828 79,719 - - $3,828
79,719
kWh
-
-
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,652
Cost:
$170
$1,652 44,549 - - $1,652
44,549
kWh
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$504
Cost:
$290
$504 13,775 - - $504
13,775
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$135
Cost:
$135
- - $135 60 -
-
kWh
$135
60
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,035
Cost:
$2,000
- - $1,035 459 -
-
kWh
$1,035
459
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$168
Cost:
$263
- - $168 62 -
-
kWh
$168
62
MMBtu
TOTAL RECOMMENDED Savings:
$10,400
Cost:
$23,453
$9,062 211,313 $1,338 581 $9,062
211,313
kWh
$1,338
581
MMBtu
TOTAL IMPLEMENTED Savings:
$8,693
Cost:
$20,900
$8,558 197,538 $135 60 $8,558
197,538
kWh
$135
60
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas