Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1996 |
Principal Product | Metal Fabrication |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 51,025 |
Annual Production | 6,068,938 Pounds |
Production Hrs. Annual | 6,660 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $79,451 | 2,219,812 | kWh | $0.04 |
Electricity Demand | $28,162 | 7,716 | kW-months/year | $3.65 |
Electricity Fees | $1,329 | - | $ | - |
Natural Gas | $42,439 | 4,154 | MMBtu | $10.22 |
TOTAL ENERGY COSTS | $283,978 | |||
RECOMMENDED SAVINGS* | $94,006 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $94,006 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,357 Cost: $8,346 |
$1,809 | 50,410 | $548 | 150 | - | - | - | - |
$1,809 50,410 kWh |
$548 150 kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,931 Cost: $1,299 |
$1,475 | 39,859 | $456 | 125 | - | - | - | - |
$1,475 39,859 kWh |
$456 125 kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,213 Cost: $220 |
$5,213 | 144,783 | - | - | - | - | - | - |
$5,213 144,783 kWh |
- - kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $895 Cost: - |
$895 | 24,912 | - | - | - | - | - | - |
$895 24,912 kWh |
- - kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $19,183 Cost: $4,200 |
- | - | - | - | $19,057 | 656 | $126 | 36 |
- - kWh |
- - kW-months/year |
$19,057 656 gal |
$126 36 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $64,427 Cost: $6,000 |
- | - | - | - | $64,364 | 1,698 | $63 | 3 |
- - kWh |
- - kW-months/year |
$64,364 1,698 gal |
$63 3 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $94,006 Cost: $20,065 |
$9,392 | 259,964 | $1,004 | 275 | $83,421 | 2,354 | $189 | 39 | $9,392 259,964 kWh |
$1,004 275 kW-months/year |
$83,421 2,354 gal |
$189 39 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $94,006 Cost: $20,065 |
$9,392 | 259,964 | $1,004 | 275 | $83,421 | 2,354 | $189 | 39 | $9,392 259,964 kWh |
$1,004 275 kW-months/year |
$83,421 2,354 gal |
$189 39 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (haz) |