IAC logo
IAC Assessment: DS0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Plating Metal Parts
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 37
Plant Area (Sq.Ft.) 19,652
Annual Production 600,000 Pieces
Production Hrs. Annual 2,470
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,128 843,200 kWh $0.04
Electricity Demand $11,088 3,036 kW-months/year $3.65
Electricity Fees $377 - $ -
Natural Gas $11,801 3,565 MMBtu $3.31
TOTAL ENERGY COSTS $71,014
RECOMMENDED SAVINGS* $11,329 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,940
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$305
Cost:
$1,149
$200 5,275 $105 29 - - $200
5,275
kWh
$105
29
kW-months/year
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,084
Cost:
$3,765
$647 17,585 $437 119 - - $647
17,585
kWh
$437
119
kW-months/year
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,434
Cost:
$1,257
$1,434 38,687 - - - - $1,434
38,687
kWh
-
-
kW-months/year
-
-
Tgal
04: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$8,506
Cost:
$17,190
$(-239) (-6,448) $(-145) (-40) $8,890 2,615,000 $(-239)
(-6,448)
kWh
$(-145)
(-40)
kW-months/year
$8,890
2,615,000
Tgal
TOTAL RECOMMENDED Savings:
$11,329
Cost:
$23,361
$2,042 55,099 $397 108 $8,890 2,615,000 $2,042
55,099
kWh
$397
108
kW-months/year
$8,890
2,615,000
Tgal
TOTAL IMPLEMENTED Savings:
$9,940
Cost:
$18,447
$1,195 32,239 $(-145) (-40) $8,890 2,615,000 $1,195
32,239
kWh
$(-145)
(-40)
kW-months/year
$8,890
2,615,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal