IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Cabinet Accessories
NAICS n/a
SIC 2534 -
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 57,600
Annual Production 371,000 Pieces
Production Hrs. Annual 4,394
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,668 667,057 kWh $0.03
Electricity Demand $16,832 2,249 kW-months/year $7.48
Electricity Fees $1,130 - $ -
Natural Gas $9,281 2,077 MMBtu $4.47
TOTAL ENERGY COSTS $47,911
RECOMMENDED SAVINGS* $29,769 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,224
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$759
Cost:
$2,283
$374 12,016 $385 52 - - - - $374
12,016
kWh
$385
52
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,726
Cost:
$21,864
$4,023 129,836 $2,703 361 - - - - $4,023
129,836
kWh
$2,703
361
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$545
Cost:
$1,344
- - - - $545 - - - -
-
kWh
-
-
kW-months/year
$545
-
$
-
-
$
04: 3.8113 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) Savings:
$21,120
Cost:
$4,724
- - - - - - $21,120 - -
-
kWh
-
-
kW-months/year
-
-
$
$21,120
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$619
Cost:
-
$619 19,930 - - - - - - $619
19,930
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,769
Cost:
$30,215
$5,016 161,782 $3,088 413 $545 - $21,120 - $5,016
161,782
kWh
$3,088
413
kW-months/year
$545
-
$
$21,120
-
$
TOTAL IMPLEMENTED Savings:
$29,224
Cost:
$28,871
$5,016 161,782 $3,088 413 - - $21,120 - $5,016
161,782
kWh
$3,088
413
kW-months/year
-
-
$
$21,120
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material