IAC Assessment: DS0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Cameras & Printers
NAICS n/a
SIC 3861 - Photographic Equipment And Supplies
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 55,000
Annual Production 1,250 Pieces
Production Hrs. Annual 4,394
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,528 622,509 kWh $0.03
Electricity Demand $17,426 2,304 kW-months/year $7.56
Electricity Fees $1,063 - $ -
Natural Gas $24,750 5,612 MMBtu $4.41
TOTAL ENERGY COSTS $64,600
RECOMMENDED SAVINGS* $7,007 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$859
Cost:
$859
$460 14,654 $399 53 - - - - - - $460
14,654
kWh
$399
53
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$638
Cost:
$175
- - - - - - - - $638 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$638
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$164
Cost:
$100
$164 4,982 - - - - - - - - $164
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,728
Cost:
$300
$1,775 56,565 $953 126 - - - - - - $1,775
56,565
kWh
$953
126
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$733
Cost:
$380
- - - - - - $733 164,580 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$733
164,580
Tgal
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,885
Cost:
$1,050
- - - - $1,885 428 - - - - -
-
kWh
-
-
kW-months/year
$1,885
428
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$7,007
Cost:
$2,864
$2,399 76,201 $1,352 179 $1,885 428 $733 164,580 $638 - $2,399
76,201
kWh
$1,352
179
kW-months/year
$1,885
428
MMBtu
$733
164,580
Tgal
$638
-
$
TOTAL IMPLEMENTED Savings:
$6,110
Cost:
$2,384
$2,235 71,219 $1,352 179 $1,885 428 - - $638 - $2,235
71,219
kWh
$1,352
179
kW-months/year
$1,885
428
MMBtu
-
-
Tgal
$638
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Raw Material