IAC Assessment: DS0060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Metal Finishing
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 90,000
Annual Production 100,000 Pieces
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $243,656 7,601,407 kWh $0.03
Electricity Demand $118,543 19,536 kW-months/year $6.07
Electricity Fees $15,300 - $ -
Natural Gas $104,312 43,752 MMBtu $2.38
TOTAL ENERGY COSTS $505,755
RECOMMENDED SAVINGS* $31,615 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,471
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,522
Cost:
$18,920
$4,512 140,973 $2,010 331 - - - - - - $4,512
140,973
kWh
$2,010
331
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,272
Cost:
$2,628
$813 25,498 $459 76 - - - - - - $813
25,498
kWh
$459
76
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,581
Cost:
$220
$1,268 39,566 $313 52 - - - - - - $1,268
39,566
kWh
$313
52
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,872
Cost:
$7,925
- - - - $4,872 2,047 - - - - -
-
kWh
-
-
kW-months/year
$4,872
2,047
MMBtu
-
-
Tgal
-
-
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,958
Cost:
$4,750
- - - - - - - - $5,958 24,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,958
24,000
lb
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$11,410
Cost:
$1,100
- - - - - - $11,410 748,800 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,410
748,800
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$31,615
Cost:
$35,543
$6,593 206,037 $2,782 459 $4,872 2,047 $11,410 748,800 $5,958 24,000 $6,593
206,037
kWh
$2,782
459
kW-months/year
$4,872
2,047
MMBtu
$11,410
748,800
Tgal
$5,958
24,000
lb
TOTAL IMPLEMENTED Savings:
$25,471
Cost:
$24,990
$5,780 180,539 $2,323 383 - - $11,410 748,800 $5,958 24,000 $5,780
180,539
kWh
$2,323
383
kW-months/year
-
-
MMBtu
$11,410
748,800
Tgal
$5,958
24,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)